Positive control room
  • Positive control room

The construction goal of the positive control room is to check and verify the results of the microbial testing room test, mainly three key points, *: negative pressure million level second: configuration biosafety cabinet third: guarantee a certain pressure gradient, clean room-positive In the control room and the biological safety cabinet, the positive control room uses a separate air conditioning system, the purification level is 10,000, and the positive control room is negative pressure relative to the adjacent buffer chamber. The biosafety cabinet protects people, the environment, and samples.


Positive control room construction opinion

1, a more cleanliness can not be required, most of what I see is efficient air supply, you can make 10,000. One can also have a wash basin or a hand sterilizer (the room is too small to set up a wash basin is not convenient). Ultraviolet germicidal lamps should be provided in one. A more pair of shoes should maintain a positive pressure.

2. The cleanliness of the second is 10,000, and the second should be kept at a positive pressure of not less than 10Pa. Ultraviolet germicidal lamps should be installed in the second.

3. The cleanliness of the positive control room is 10,000, and the positive pair should be kept relatively negative. A biosafety cabinet (also available as a vertical laminar flow table) should be provided in the positive control room. Ultraviolet germicidal lamps should be provided in the positive control room. A transfer window with an ultraviolet lamp should be provided between the positive control room and the preparation room.

4. There are no special requirements for the shoe area.

5. There should be a sink and UV lamp in the preparation room. A normal air conditioner can be installed in the preparation room. A side table is usually set in the preparation room.

6, one more, two more, positive control three rooms can use a clean air supply system, this system is a new wind system, the air can not be recycled. Exhaust air can be directly discharged to the outside (there are many powerful units that are also installed in the exhaust air, and the exhaust air is efficiently filtered and then discharged to the outside. The indoor temperature and humidity are controlled at 18-26 ° C, 40-60%. Illuminance Not less than 300 lux.

7. Nowadays, PVC floor is usually used, and color steel plate is used for the envelope structure.

Undertake: sales and installation of purification equipment across the country

Get quotes quickly

*The quotation will be sent to your mobile phone as a text message or contact a professional technician to contact you.

  • *
  • *
  • *
主站蜘蛛池模板: 在线一区二区三区四区 | 国产91精品一区二区三区四区 | 国产a一级片 | 超频97人妻在线视频 | 西西人体44www大胆无码 | 国产一级久久久久 | 亚洲成人黄色 | 久久人人爽人人爽人人片av高请 | 国产精品资源一区二区三区 | 欧美成人毛片 | 精品黄色一级片 | 国产揄拍视频一区 | 国产乱淫视频免费 | 亚洲国产另类久久久精品极度 | 热久久精 | 亚洲精品久久7777 | 日本伦理一区二区三区 | 中文字幕av日韩精品一区二区 | 欧美a∨一区二区三区久久黄 | 国产乱子伦无码精品小说 | 亚洲视频在线观看中文字幕 | 久久超碰99| a级黑粗大硬长爽猛片视频 九九综合视频 | 国产伦理自拍 | 美女一区二区三区四区 | 欧美一级特黄色片 | 久久久日韩精品一区二区 | 日韩欧美一区二区东京热 | 91超碰刺激偷拍 | 狠狠躁夜夜躁久久躁别揉 | 免费观看网站入口 | 精品一区二区三区不卡少妇 | 久久久久激情视频 | 欧美日韩精品久久久免费观看 | 成人午夜精品一区二区三区 | 亚洲无码自拍偷拍视频 | 色九九九 | 中文字幕在线观看视频网站 | 中国一级毛片视频 | 国产日韓无码一区二区三区久久区 | 久久精品成人无码观看 |