Design requirements for food plant construction drawings?

Author: Shenzhen Zhongjing Global Purification Technology Co., Ltd.issuing time:2018-07-23 20:35:02Pageviews:3589smallinBig

The construction drawing design of the food factory mainly transforms the design concept and design intention of the engineering and technical personnel into the engineering executable language, whi...

    The construction drawing design of the food factory mainly transforms the design concept and design intention of the engineering and technical personnel into the engineering executable language, which is embodied in the drawings, and then through manufacturing, construction and installation, the whole design project is changed from the idea to the reality; the construction drawing design It is a very specific, practical and meticulous design work that reflects design ideas in engineering language. It requires high-tech and technical personnel to have a high level of science and technology and rich practical experience; construction and installation are in accordance with the drawings. The construction drawing is of good quality, the construction will be smooth, and the production will be smooth. On the contrary, it will affect the progress of the whole project. The design basis of the food plant construction drawing is the approved preliminary design or technical design and approval opinions; the main equipment technical materials and product samples ordered by the construction unit; the agreement signed by the construction unit and each cooperation unit and each department; Technical data, product samples, national standard atlas, enterprise standard atlas of various regional departments, construction regulations and installation methods of construction and installation units.


    The design content and complexity of the construction drawings are also related to the technical level of the construction and installation units. For the construction and installation units with strong technical strength, rich experience and accumulated technical data, many common drawings can be simplified or omitted. Process part: including production flow chart, workshop process equipment layout plan, elevation plan, pipe layout plan, section or perspective view, equipment installation diagram, console, equipment and pipe supports, hangers, pipe parts, tools and equipment Table, material summary table, etc.; power part: including boiler room, air compressor station, freezer and cold storage equipment layout diagram, installation diagram, pipeline flow chart, pipeline insulation structure diagram, equipment room and plant pipeline layout diagram, main support, Hanging map and equipment table, material table, etc.; civil engineering part: including general layout plan, plant earth balance map, architectural plan of some buildings, elevation, structure and section, various node details, selection Standard maps, general maps, door and window diagrams, etc., building walls, roads, and channel structures. Zhongjing Global Purification can provide consulting services, consulting, design, construction and decoration services for food factories and food purification workshops.


    Food plant construction drawings for water supply and drainage: including water supply, drainage, water treatment, sewage treatment equipment layout, pipeline layout, plant drainage manhole, fire protection system, cooling tower and recycling water, wastewater recycling and equipment table, living room, sanitary equipment, bathroom Drainage pipe arrangement; heating and ventilation part, including ventilation, dust removal, heating, air conditioning equipment and piping layout, system diagram, pipeline installation and construction details, material list, general drawing and equipment table; instrument and automatic control part: including production process Flow, quality, liquid level, temperature, pressure of various media, indications of instruments, signals, schematic diagrams of adjustment systems, instrument panels, instrument cabinet layout diagrams, wiring diagrams and material tables, circuit diagrams; power supply: including Substation, high and low voltage power distribution room equipment layout, lighting wiring diagram, factory wiring system, lightning protection, communication, non-standard power distribution cabinet wiring diagram, installation details and equipment table, material table, lighting wiring diagram; construction instructions : The construction instructions including the various professional types of work are different, and the construction requirements of the process are required to install the equipment.

2018-07-23 3589People browsing
Undertake: sales and installation of purification equipment across the country

Get quotes quickly

*The quotation will be sent to your mobile phone as a text message or contact a professional technician to contact you.

主站蜘蛛池模板: 亚洲 一区 二区 | 久久久精品日本一区二区三区 | 欧产日产国产精品视频 | 久久久久国精品产熟女久色 | 国产视频精品一区二区三区 | 国产在线精品一区二区 | 日本一级大毛片a一 | 日本中文字幕在线免费 | 成人av中文解说水果派在线观看 | 国产精品无圣光 | 国产免费v | 日韩精品一区二区三区免费视频喜 | 又黄又爽又高潮免费毛片 | 懂色av一区二区三区免费 | 国产成人福利在线 | 伊人久久成人 | 日韩一区二区高清精品综合视频 | 精品一区二区三区在线观看视频 | 69热在线观看 | 99re视频在线观看 | 欧美黑人性生活 | 日韩www视频 | 99亚洲视频 | 久久久亚洲精品国产 | 亚洲欧洲自拍拍偷精品美利坚 | 麻豆91精品91久久久 | 一区二区在线观看免费 | 涩涩资源中文字幕久久婷婷爱 | 男人J进入女人J内部免费网站 | 成人深夜免费视频 | 黑人精品素人在线视频观看 | 一区二区在线精品 | 国语自产少妇精品视频蜜桃 | 免费在线观看中文字幕 | 国产一区二区免费播放 | 日本一区二区三区在线免费观看 | 日本午夜精品一区二区三区 | 国产成人免费网站在线观看 | 国产永久免费观看 | yy6080午夜八戒国产亚洲 | 日韩欧美精品区 |